Office Use Only
NCR Number #
Copy of NCR
in job pack(tick):
CUSTOMER DETAILS: OLYMPIC FENCING - RUTHERFORD
Work Order # 5686 Job # 2063
DATE IN Thu 18 Apr 2024
DATE REQUIRED Thu 18 Apr 2024
WS-CUSTOM build and install hand rail and ladder for oven in pc 1
Bill of Materials
-- 001-3053SP 001-3053SP MF Keeper BP 2.0000 ________
-- 10657 NETTING NETTING 180X50X1.6 X 50M 3.0000 ________
-- 358Mesh2.1x2.4Z Securemax Sheet 2404mm wide x 2100mm high Zalcote 1.0000 ________
Record Time
Pipe Gate Processing 55.00 0 ________
Welding pipe posts/gates 67.00 0 ________

Notes

ALL DIMENSIONS ON DRAWINGS TO BE RECORDED & INITIALLED DURING FAB and MACHINING
WORK INSTRUCTIONS Target
Time
frame
MUST BE COMPLETED BY WORKER FMS
Checked
by
Equipment
Calibrated
by
Start
size
(Dia.)
FMS
(Dia.)
Length
metal
sprayed
Time
taken
Worker
initials
Calibrate & Write down your start & finished machine sizes for ALL diameters!
Hold points to be utilised = prep size to be included in job
instructions and checked before spraying, size after
spraying to be checked, and job to be checked before
taking off borer after finish cut.
Have returned all tooling to the correct location? Y / N
LIST MATERIALS / CONSUMABLES USED
JOB PACKING CHECKLIST Name of person packing
______________________
Date packed _________________________
Pallet – (circle)
New or Used
Weight of job _________kg
Weight marked on job
Is job secured with
PTE strapping?
Is rubber between
strapping & job?
Is job wrapped
in plastic?
QUALITY CONTROL - FINAL INSPECTION UPON JOB COMPLETION
Supervisor: Date Inspected: