Office Use Only NCR Number # |
Copy of NCR in job pack(tick): |
| CUSTOMER DETAILS: |
Power Court |
|
|
| Work Order # 5997 |
Job # 7054 |
| DATE IN |
Wed 10 Apr 2024 |
| DATE REQUIRED |
Thu 25 Apr 2024 |
|
NOTES:Notes |
ITEM TO BE MANUFACTURED |
| CODE |
DESCRIPTION |
QTY |
COMPLETE |
| 1. CLGSPT2112 |
CHAIN LINK PLAIN TOP SINGLE GATE FRAME ONLY. 2100 H X 1130 W OPENING. 25nb frame, powder coated Black. Shoot bolt. Color: Black |
2 |
|
MANUFACTURE SPECIAL INSTRUCTIONS
Powder coated frame only
|
| RECORD MATERIAL USED (BOM) |
| CODE |
DESCRIPTION |
ALLOC. |
ACTUAL |
| GEB12 |
GATE ENTRY BRACE 110 X 190MM, GAL |
1.0000 |
|
| B8 |
SHOOT BOLT & SLIDE PLATE, 150MM LONG, 12DIA, GAL |
1.0000 |
|
| PXLG25 |
Bottom Rail Vogel Cut 1 X PXLG25 @ 1109 |
1.1090 |
|
| PXLG20 |
Horizontal Bracing 1 X PXLG20 @ 1101
|
1.1010 |
|
| PXLG25 |
Cut Crown Bar PXLG25 X 1 @ 5328 Bend 1 2029 Bend 2 3149 |
5.3280 |
|
| CLHG210050315KK |
2091 H x 50 x 3.15MM (KK) - HVY GALV C/LINK FABRIC |
1.3200 |
|
| TWHG1571KG |
NOT FOR QUOTING - Tie wire 1.57mm gauge per kg. Galvanized. |
0.3511 |
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| RECORD TIME |
| WORK PROCESS |
ALLOWED |
QTY |
DAY1 |
DAY2 |
DAY3 |
DAY4 |
| SHS processing |
13.00 (MIN.) |
2 |
|
|
|
|
| Punch Flat, angle, UC, PFC |
22.00 (MIN.) |
8 |
|
|
|
|
| Hot Dipped Galvanize |
40.00 (MIN.) |
2 |
|
|
|
|
| Powdercoating |
15.00 (MIN.) |
2 |
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
ITEM TO BE MANUFACTURED |
| CODE |
DESCRIPTION |
QTY |
COMPLETE |
| 2. PMG50 |
Pipe 50nb (60.3mm x 3.6mm) Medium gauge, per metre. Galvanized. Gate Surround - single bend @ 3800mm
Powdercoated Black (COVERED WITH PLASTIC PROTECTION SOCK) Color: Black |
2 |
|
| RECORD MATERIAL USED (BOM) |
| CODE |
DESCRIPTION |
ALLOC. |
ACTUAL |
| PMG50-7200 |
PMG50-7200 | Pipe 50nb (60.3mm x 3.6mm) Medium gauge x 7200mm long. Galvanized.... includes 3400 waste |
1.0000 |
|
| PCP2550PM |
PCP2550PM | POWDER COATING RATE, PER METER, FOR PIPE SIZES BETWEEN 25 AND 50 NB INCLUSIVE. |
3.8000 |
|
| |
|
|
|
| |
|
|
|
| |
|
|
|
| RECORD TIME |
| WORK PROCESS |
ALLOWED |
QTY |
DAY1 |
DAY2 |
DAY3 |
DAY4 |
| Picking |
1.33 (MIN.) |
2 |
|
|
|
|
| Powdercoating |
2.00 (MIN.) |
2 |
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| ALL DIMENSIONS ON DRAWINGS TO BE RECORDED & INITIALLED DURING FAB and MACHINING |
| WORK INSTRUCTIONS |
Target Time frame |
MUST BE COMPLETED BY WORKER |
FMS Checked by |
Equipment Calibrated by |
Start size (Dia.) |
FMS (Dia.) |
Length metal sprayed |
Time taken |
Worker initials |
|
|
Calibrate & Write down your start & finished machine sizes for ALL diameters! |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
Hold points to be utilised = prep size to be included in job instructions and checked before spraying, size after spraying to be checked, and job to be checked before taking off borer after finish cut. |
| | | | | | |
| | | | | | |
| Have returned all tooling to the correct location? Y / N |
|
| JOB PACKING CHECKLIST |
Name of person packing ______________________ |
Date packed _________________________ |
|
Pallet – (circle) New or Used |
Weight of job _________kg Weight marked on job |
Is job secured with PTE strapping? |
Is rubber between strapping & job? |
Is job wrapped in plastic? |
|
| QUALITY CONTROL - FINAL INSPECTION UPON JOB COMPLETION |
| Supervisor: |
Date Inspected: |
|