Office Use Only
NCR Number #
Copy of NCR
in job pack(tick):
CUSTOMER DETAILS: Power Court
Work Order # 5997 Job # 7054
DATE IN Wed 10 Apr 2024
DATE REQUIRED Thu 25 Apr 2024
NOTES:

Notes

ITEM TO BE MANUFACTURED

CODE DESCRIPTION QTY COMPLETE
1. CLGSPT2112 CHAIN LINK PLAIN TOP SINGLE GATE FRAME ONLY. 2100 H X 1130 W OPENING. 25nb frame, powder coated Black. Shoot bolt. Color: Black 2  
MANUFACTURE SPECIAL INSTRUCTIONS
Powder coated frame only
RECORD MATERIAL USED (BOM)
CODE DESCRIPTION ALLOC. ACTUAL
GEB12 GATE ENTRY BRACE 110 X 190MM, GAL 1.0000
B8 SHOOT BOLT & SLIDE PLATE, 150MM LONG, 12DIA, GAL 1.0000
PXLG25 Bottom Rail Vogel Cut 1 X PXLG25 @ 1109 1.1090
PXLG20 Horizontal Bracing 1 X PXLG20 @ 1101
1.1010
PXLG25 Cut Crown Bar PXLG25 X 1 @ 5328 Bend 1 2029 Bend 2 3149 5.3280
CLHG210050315KK 2091 H x 50 x 3.15MM (KK) - HVY GALV C/LINK FABRIC 1.3200
TWHG1571KG NOT FOR QUOTING - Tie wire 1.57mm gauge per kg. Galvanized. 0.3511
 
 
 
RECORD TIME
WORK PROCESS ALLOWED QTY DAY1 DAY2 DAY3 DAY4
SHS processing 13.00 (MIN.) 2
Punch Flat, angle, UC, PFC 22.00 (MIN.) 8
Hot Dipped Galvanize 40.00 (MIN.) 2
Powdercoating 15.00 (MIN.) 2
 
 
 

ITEM TO BE MANUFACTURED

CODE DESCRIPTION QTY COMPLETE
2. PMG50 Pipe 50nb (60.3mm x 3.6mm) Medium gauge, per metre. Galvanized. Gate Surround - single bend @ 3800mm
Powdercoated Black (COVERED WITH PLASTIC PROTECTION SOCK) Color: Black
2  
RECORD MATERIAL USED (BOM)
CODE DESCRIPTION ALLOC. ACTUAL
PMG50-7200 PMG50-7200 | Pipe 50nb (60.3mm x 3.6mm) Medium gauge x 7200mm long. Galvanized.... includes 3400 waste 1.0000
PCP2550PM PCP2550PM | POWDER COATING RATE, PER METER, FOR PIPE SIZES BETWEEN 25 AND 50 NB INCLUSIVE. 3.8000
 
 
 
RECORD TIME
WORK PROCESS ALLOWED QTY DAY1 DAY2 DAY3 DAY4
Picking 1.33 (MIN.) 2
Powdercoating 2.00 (MIN.) 2
 
 
 
ALL DIMENSIONS ON DRAWINGS TO BE RECORDED & INITIALLED DURING FAB and MACHINING
WORK INSTRUCTIONS Target
Time
frame
MUST BE COMPLETED BY WORKER FMS
Checked
by
Equipment
Calibrated
by
Start
size
(Dia.)
FMS
(Dia.)
Length
metal
sprayed
Time
taken
Worker
initials
Calibrate & Write down your start & finished machine sizes for ALL diameters!
Hold points to be utilised = prep size to be included in job
instructions and checked before spraying, size after
spraying to be checked, and job to be checked before
taking off borer after finish cut.
Have returned all tooling to the correct location? Y / N
JOB PACKING CHECKLIST Name of person packing
______________________
Date packed _________________________
Pallet – (circle)
New or Used
Weight of job _________kg
Weight marked on job
Is job secured with
PTE strapping?
Is rubber between
strapping & job?
Is job wrapped
in plastic?
QUALITY CONTROL - FINAL INSPECTION UPON JOB COMPLETION
Supervisor: Date Inspected: