Office Use Only NCR Number # |
Copy of NCR in job pack(tick): |
|
|
|
| Work Order # |
Job # |
| DATE IN |
Thu 01 Jan 1970 |
| DATE REQUIRED |
Thu 01 Jan 1970 |
|
|
LLTC_003544 |
Laser lite 2000 5 Rib. 830mm wide x 4.8m long. Clear. |
2 |
|
Bill of Materials
| -- |
LLTC_003544 |
Laser lite 2000 5 Rib. 830mm wide x 4.8m long. Clear. |
3.0000 |
________ |
| -- |
10657 NETTING |
NETTING 180X50X1.6 X 50M |
2.0000 |
________ |
Record Time
| Pipe Gate Processing |
55.00 |
|
|
0 |
________ |
| Welding pipe posts/gates |
22.00 |
|
|
0 |
________ |
| Powdercoating |
16.00 |
|
|
0 |
________ |
|
Notes |
| ALL DIMENSIONS ON DRAWINGS TO BE RECORDED & INITIALLED DURING FAB and MACHINING |
| WORK INSTRUCTIONS |
Target Time frame |
MUST BE COMPLETED BY WORKER |
FMS Checked by |
Equipment Calibrated by |
Start size (Dia.) |
FMS (Dia.) |
Length metal sprayed |
Time taken |
Worker initials |
|
|
Calibrate & Write down your start & finished machine sizes for ALL diameters! |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
Hold points to be utilised = prep size to be included in job instructions and checked before spraying, size after spraying to be checked, and job to be checked before taking off borer after finish cut. |
| | | | | | |
| | | | | | |
| Have returned all tooling to the correct location? Y / N |
|
| LIST MATERIALS / CONSUMABLES USED |
|
|
| JOB PACKING CHECKLIST |
Name of person packing ______________________ |
Date packed _________________________ |
|
Pallet – (circle) New or Used |
Weight of job _________kg Weight marked on job |
Is job secured with PTE strapping? |
Is rubber between strapping & job? |
Is job wrapped in plastic? |
|
| QUALITY CONTROL - FINAL INSPECTION UPON JOB COMPLETION |
| Supervisor: |
Date Inspected: |