logo
Shop Drawings

WORK ORDER WORKSHOP REPORT - 5/Jul/2024 07:36 PM shane@vinesit.com.au
W/O Number:WS04072024-2Job Number:22708
Date Issued:5/Jul/2024 07:36 PMDate Required:
W/O Raised By:Shane CosgroveClient:Test Company
Job Location: 113 Exhibition Street Melbourne VIC 113 Exhibition Street Melbourne VIC


NOMINAL WIDTH6000
NOMINAL HEIGHT1800
CHAIN LINK50x3.15 KK Heavy Galvanized
SELECTED CHAIN LINK FABRIC HEIGHT[22 LESS 0.5 DIAMOND] 1804
ACTUAL FRAME HEIGHT1912
*GATE FRAME GALVANIZED FINISH

Cut Crown Bar DN32-XLG :: 1 X 4779 mm
Bend Crown Bar
BOTTOM RAILS [VOGEL CUT]DN32-XLG: 1 X 2898 MM
CENTRE RAILS
VERTICAL BRACES[VOGEL CUT]DN25-XLG: 2 X 931 MM
DRILL HOLE FOR SHOOT BOLT828 MM

ITEMPIPEWORKSHOP CUTTING & BENDING (STAGE 1)NUMBER OF UNITSMINUTES PER UNITTOTAL MINUTES
DN32-XLGCUT CROWN BAR RAILS11.51.5
DN32-XLGBEND CROWN BAR2510
DN32-XLGCUT BOTTOM RAILS11.51.5
CUT CENTRE RAILS000
DN32-XLGCUT VERTICAL BRACING21.252.5
VOGEL NOTCH BOTH ENDS OF BRACING RAILS313
DRILLING SHOOT BOLT HOLE122
TOTAL CUT & PREP TIME FOR GATE FRAME20.5

ITEMPIPEWORKSHOP WELDING GATE FRAMES (STAGE 2.A)NUMBER OF UNITSMINUTES PER UNITTOTAL MINUTES
SETUP TIME ON WELDING BENCH (TACKING FRAME)616
DN32-XLGWELD OUTER FRAME25.511
WELD INTERNAL RAIL000
DN32-XLGWELD VERTICAL BRACING44.518
TOTAL WELDING TIME FOR GATE FRAME ONLY35
ITEMCODEIMAGEWORKSHOP GATE FITTINGS (STAGE 2.B)NUMBER OF UNITSMINUTES PER UNITTOTAL MINUTES
H8032DTWO PART INTERLOCKING HINGES + ATTACHMENT - GALVANISED212
GEB12-SL"SINGLE (""L"" SHAPE) HAND HOLE (FOR TOP OF MID RAIL) ( 12MM ROD - 90MM X 186MM) FOR STANDARD SINGLE GATE SHOOT BOLT- GALVANISED"111
GDB370SHORT DROP BOLTS - GALVANISED111
B8SHOOT BOLT (WITH SLIDE PLATE) - GALVANISED122
HCRHINGE COLLAR133
TOTAL WELDING TIME FOR SELECTED WELD ON GATE FITTINGS ONLY9
ITEMWIRE UP GATE FRAMES (STAGE 3)NUMBER OF UNITSMINUTES PER UNITTOTAL MINUTES
STEP 1DE-SCALE WELDS & PRIME PAINT ALL WELDS616
STEP 2FIT CHAIN LINK TO GATE FRAME BASED ON M23SQM26
STEP 3TRIM & KNUCKLE CHAIN LINK TO BOTTOM RAIL M2.92.57.25
STEP 4SHAPE IN HAND HOLES111
STEP 5LOAD UP GALV LACING WIRE TO NEEDLE KG0.47 KG41.88
STEP 6LACE UP PERIMETER OF GATE FRAMES8M540
TOTAL LACING TIME FOR GATE FRAME ONLY62.13 MIN
SETUP TIME ALLOWANCE BETWEEN STAGES 1 TO 318
TOTAL O/ALL MINUTES ALLOWED FOR MANUFACTURER OF GATE (BASED ON CURRENT STANDARDS)144.63