Cost Report

To,
Test Company
TBA
TBA, TBA, TBA
TBA,

Workorder Number:WS02072024-1

Job Number:22705

Date:8/Jul/2024 02:51 PM


Summary List of Gate Size

Gate NumberOpening SizeO/all Gate Frame HeightPipeChainlinkOpening SideCost
154001912DN40-XLG Heavy Galvanized 50x3.15 KK LH 755.36


Summary of Material Cost
Material Code Qty Cost Total
Outer Pipe Cost DN40-XLG 14.22 6.9 98.12
Horizontal Pipe Cost DN25-XLG 5.27 4.14 21.82
Vertical Pipe Cost DN25-XLG 7.11 4.14 29.44
Chain-Link Cost 50x3.15 9.72 6.09 59.19
Lacing Wire Cost Heavy Galvanized 0.94 3.28 3.08
Total211.65
Standard Fittings
Diagonal Flat Brace FBG5005 5.66 9.389 53.14
SHORT DROP BOLTS - Galvanised GDB370 1 5.6385 5.64
Hinge Collar HCR 1 0.5 0.5
Total Standard Fitting Cost59.28
Custom Fittings
Total Custom Fitting Cost 0
Total Fitting Cost 6.14
Total Material Cost 270.93



Summary of Labour Cost.
Item Time(min) Rate/hr Total
Stage 1, Cutting, Notching 40.25 90 60.38
Stage 2.A & 2.B Welding 141.5 90 212.25
Stage 3. Lacing Chain Link to Gates 123.2 90 184.8
Set Up Time Between 3 Stages @ 6.0 min 18 90 27
TOTAL WORKSHOP LABOUR COST484.43



Summary of waste factor cost
Item Rate (%) Cost
Chain-link 0% 0
Lacing wire 0% 0
Pipe 0% 0
Tube 0% 0
Total waste factor0

Total Cost: 755.36